Journal

Landscaping around the house

How to plan the driveway, terraces, greenery and garden lighting together with the architecture.

Reading time 2 minSend an enquiry

Villa in Lubliniec, driveway
Villa in LubliniecDriveway
In brief

The key points in four steps.

Access

Entry, parking and entrance.

Terraces

Zones linked to the interior.

Greenery

Planting chosen for the house and the plot.

Light and water

Garden lighting and drainage.

The plot is not a backdrop for the house but part of it. Where you drive in, where you drink your morning coffee and what you see from the sofa all depend on the landscaping. It is best planned together with the massing.

Layout and access

The entry, parking spaces and entrance should be clear and convenient. A well-placed driveway does not take the best part of the garden and does not bring cars under the living room windows. This can be seen in the design of Villa in Lubliniec, where the driveway, greenery and massing form one composition.

Residence in Lubliniec, garden with terrace
Residence in LubliniecGarden with terrace

Terraces and zones

A place to eat by the kitchen, a lounge area sheltered from the wind, a corner for the children within sight. Each zone has its link with the interior, and a terrace level flush with the living room floor blurs the line between house and garden.

The plot is not a backdrop for the house. It is part of it.

Greenery

Planting is chosen to suit the character of the house and the conditions of the plot. Clumps of grasses, ferns and native shrubs need less care than clipped forms and look good all year round. Existing trees are worth treating as capital, as in the Villa near Poznań.

Light in the garden

A few well-placed fittings are enough to make the garden an extension of the living room in the evening. Lighting for the driveway, entrance and terrace is planned together with the house installations.

Water and drainage

Ground levels, rainwater retention and the places where water is to soak away are resolved in the concept. That way the terrace does not stand in water and the lawn needs no repairs after the first downpour.

When to design

Before the foundations are laid. Levels, culverts and underground installations are cheapest to build during construction of the house, not after it.

Where to start

A short description of the project, floor plans and the location are enough. In reply we prepare a proposal with the scope of work, price and schedule. Send an enquiry or see full portfolio.

All articlesFull portfolioSend an enquiry

Projects

The projects mentioned here.

Projects

Every project, a different story.

Interiors and architecture from the studio's portfolio. Every photo leads to the full project.

Full portfolio
Journal

Read too.

All articles

Contact

Let's create another exceptional project.

A short description of the project is enough. We reply on working days, Monday to Friday, 8:00–17:00.

Send an enquiry
Send an enquiry